Concrete and steel calculator (lantar aur chhat)

Cement, sand and crush for a slab, beam, column or footing, and the steel counted from the bars on your drawing.

Concrete and steel (lantar, chhat, beam, column)

Cement, sand and crush for a slab, beam, column or footing, from that element’s own dimensions. Steel is counted from the bars on your approved structural drawing — sizes, spacings and counts you enter, in metric or inch bars — never designed here.

The figures already filled in are an example. Replace them with your own measurements; the result updates as you type.

Element
Concrete mix

Use the mix on your drawing.

Steel from the drawing

Slabs: bars both ways at the spacings on your drawing, stopped short of the edges by the cover.

Templates cover slabs, beams and columns. For a footing or other element, choose the bar list.

Bars from your drawing’s bar list: size, cut length (including hooks and bends) and how many.

Any other bars on the drawing (top bars over supports, extra bars, cranks): add them here. Optional.

Prices (optional)

Leave a price blank if you do not know it: the item is then shown as not priced, never as zero.

Common questions

How much cement goes into a 100 sq ft, 5 inch slab?

That is 41.7 cu ft of concrete. At 1 : 2 : 4 it needs about 41.7 × 1.54 = 64.2 cu ft of dry material, of which one seventh is cement: 9.2 cu ft, or 7.3 bags of 50 kg, with about 18 cu ft of sand and 37 cu ft of crush.

Where do the bar sizes and spacing come from?

From the structural drawing that was approved with your plan, prepared by an engineer for your spans and loads. This calculator counts the steel in that drawing so you buy the right amount; it does not decide sizes, spacings or covers. If the mistri wants to change the drawing, ask the engineer, not the mistri.

Metric or inch bars?

Both are sold. Inch bars are named in sutar (eighths of an inch): 3 sutar = 3/8 in = #3 (9.5 mm), 4 sutar = 1/2 in (12.7 mm). Metric bars are 8, 10, 12, 16, 20 or 25 mm. They are different bars — a 12 mm bar is not a 1/2 in bar — so pick exactly what the drawing says. Weight is d² ÷ 162 kg per metre (d in mm).

How long before the shuttering comes off?

Follow your engineer; a common rule is slab props 21 days and long beams 28 days. Cure by ponding water on the slab from the next morning for at least 14 days.

More free tools

  • House builderDraw your rooms on your plot, drag things into place, then tap anything to see the tiles, paint, cement and wire it needs.
  • Society legal statusSearch any housing society in Islamabad or Rawalpindi and see whether it is approved, NOC in process, or illegal, with the approved area.
  • Plot price checkPick the society, phase, block and plot size to see the dated price references we have, with their source — or a clear note when there are none.
  • Cost by plot sizeQuantities for a house on your plot, an illustrative range at sample rates, or a total at your own rates.
  • TilesFloor or wall tiles and boxes, with waste, bedding or adhesive, at your prices.
  • PaintLitres and packs for the walls and ceilings you choose, with primer and putty.
  • Daily cement mixBags, rehri and tasla for today’s plaster, brickwork, bedding or PCC, batch by batch.
  • Bricks & blocksBricks or blocks from their real size and joint, with mortar or adhesive.
  • WiringMetres and coils per cable for the routes your electrician has planned.
  • Cost estimateA line-by-line budget at the rates you are quoted, with unpriced lines listed.
  • ChecklistFourteen stages: what to buy, what to check with the mistri, and what to photograph before it is covered.

Want a builder to check the numbers?

Blackfire Real Estate & Builders builds on labour or contract rate in Islamabad and Rawalpindi and does one-off site checks for people building themselves.

0371-7581455

All quantities on this site are estimates for planning and buying. Site conditions, workmanship and brands change the real figures. Structural sizes and reinforcement must come from your approved drawings and engineer.